Liste des Groupes | Revenir à c arch |
On Sat, 14 Sep 2024 22:49:21 +0000
mitchalsup@aol.com (MitchAlsup1) wrote:
Engineering costs were at least 200 engineers for 2 decades at>>
I do not believe that the sales revenue even met the engineering and
manufacturing costs.
>
ASP was certainly many time higher than manufacturing cost, esp. after
migration to 90nm in 2006.
Engineering cost was huge up until 2010, but significant part of what
was spent in 2005-2010 (development of QPI) was reused by Xeons.
In 2010-2012 engineering cost was probably quite moderate.
From 2013 to EOL in 2022 engineering cost was very low.
So, even if Itanium enterprise as whole lost a lot of money its
last 12-13 years taken in isolation were likely quite profitable.
Les messages affichés proviennent d'usenet.