Sujet : Re: Yet Another New Machine
De : none (at) *nospam* none.com99 (Bob La Londe)
Groupes : rec.crafts.metalworkingDate : 06. Nov 2024, 22:01:34
Autres entêtes
Organisation : A noiseless patient Spider
Message-ID : <vgglfd$299en$1@dont-email.me>
References : 1 2 3 4 5
User-Agent : Mozilla Thunderbird
On 11/4/2024 7:13 PM, Jim Wilkins wrote:
"Bob La Londe" wrote in message news:vgbl3p$15ami$1@dont-email.me...
First off I have "built up" a couple CNC control systems. Designed might be a strong word, but assembled from assorted "black boxes" would not. The thing is the Masso G3 control does "almost" everything in one finished unit for not much more than I could buy the parts, and it appears to be code compatible with what I am already using so the post processor would need little or no modification. Yes I have modified the post processors for all of my different machines. Most are just minor tweaks. Actually I rewrote the macros more than modified the post on the Mach controlled machines, so except for physical capability the code is cross compatible on all of those.
>
Well if I was cheap I could build a controller a lot cheaper, but I'm tired of tweaking machines for weeks to get them to run right.
I was warned to expect 3-4 weeks to ship as they build machines to
order. I got notice this morning my machine is shipping today. I guess
I'll be desperately be trying to build a base and table for it in the
next couple days before it arrives.
Okay... maybe not
UPS doesn’t have possession of the package yet. Estimated delivery date will be available as soon as we get the package.
Sigh! One of those. Create a label and provide tracking to delay claims if there is an issue or the customer gets tired of waiting. I hate that. I was all excited on Monday. Oh, well.
-- Bob La LondeCNC Molds N Stuff-- This email has been checked for viruses by AVG antivirus software.www.avg.com