Liste des Groupes | Revenir à se design |
The ones in my neck of the woods (3 of them) all 1GW are in public consultation at the moment. It is likely to get rather interesting.State legislature is pushing laws/incentives to support *pumped*
The ones with the most detailed prospectus after first stage public consultation are at Teesside former steelworks site (fair enough) and South Kilvington green field site (not good). The battery modules look way too close together in the plans for my liking - any fire would have spread before the fire brigade even got there.
Les messages affichés proviennent d'usenet.